SamplesBoiwrote:
Kennedy said "before the decade is over" idiot
And it came to pass, 8 years later, in 1969 BEFORE THE DECADE WAS OVER!
Exactly. Trump is doing it faster than Kennedy. Trump > Kennedy.
........................................................................
SampledBoy wrote:
Exactly. Trump is doing it faster than Kennedy. Trump > Kennedy.
retardo.gif Building a factory is easier than sending a man to the moon...
Trump=

........................................................................
Phillip_McCavitywrote:
Let’s be honest about this shyt… if there were actually private capital willing to risk their own money I’d say go right ahead but that’s not what this is. At best it’ll be a taxpayer funded pork barrel scam and most likely it’s just another empty vote-buying promise like the DOGE dividends, the tariff rebates or the $5,000 checks.
I agree that this is very likely. Private capital wouldn't hesitate to fund this if it would produce returns.
........................................................................
Phillip_McCavityVP_Spiro_T_Cheney wrote:
Still pricey. The Mesabi range produced taconite which is only 60 or so % iron, not pure enough for an electric arc furnace. So they’ll have to ship all that taconite by rail (expensive) and then convert it to direct reduced iron (90% pure) using natural gas sourced from Canada (expensive).
And the electric arc furnace will require a new power plant, probably also Canadian natural gas powered (expensive).
Rail is expensive compared to shipping, That’s why the large steel mills were built along the Great Lakes. Cheap bulk freight, easy access to raw materials.
They are installing special equipment at the mine to process to DR pellets (which the company is calling "freedom pellets" 
The plant can also take scrap steel.
........................................................................
VP_Spiro_T_CheneyPhillip_McCavity wrote:
They are installing special equipment at the mine to process to DR pellets (which the company is calling "freedom pellets"
The plant can also take scrap steel.
Nope, article states that DR will be in Iowa, so they can save some energy cost by packing the iron into the arc furnaces while It’s still hot from the DRI process.
........................................................................
wrote:
Iowa has no iron ore, no coking coal and no ship transport. There is a reason the big U.S. steel mills are located ON the Great Lakes. Transport costs will make this the least cost competitive plant on earth.
3 months in they will do a strategic pivot to focus resources where they can achieve synergies in the pursuit of cost effective green AI.
........................................................................